
Algoma Steel incident will have no impact on blast furnace restart
Algoma Steel advised there was an incident at the north casthouse of the blast furnace complex where slag made contact with moisture…

Algoma Steel advised there was an incident at the north casthouse of the blast furnace complex where slag made contact with moisture…

The blast furnace (BF) capacity utilization rate increased for the fifth straight week during February 2-8 to reach 83.8%,

The blast furnace (BF) capacity utilization rate among the 247 Chinese steel producers changed little on week at 83.57%

Tata Steel Netherlands resumed operations at its blast furnace No 6 in IJmuiden early this week after 10 months of downtime,

According to SMM research, on January 31, the blast furnace operating rate was 88.55%, up 0.15% MoM. The utilization rate was 89.60%

Tata Steel formally announced its plans to permanently blow down the two blast furnaces at its Port Talbot works.

On January 24, the blast furnace operating rate was 88.40%, up by 0.29% WoW. The blast furnace capacity utilization rate was 89.44%

The blast furnace (BF) capacity utilization rate climbed for the second straight week to reach 82.98% over January 12-18

Usiminas, a major Brazilian steelmaker, is making a significant move by restarting its largest blast furnace.

The blast furnace (BF) capacity utilization rate ended a 10-week drop and rebounded to 82.56% during January 5-11

The blast furnace capacity utilization rate among Chinese steel producers had fallen for the 10th consecutive week to 81.59%

German steelmaker Salzgitter has successfully restarted its blast furnace No. 2 after a comprehensive modernization project